Project CF Sailing Association Waterlot Remediation Program

  • Location (CF Sailing Association Waterlot, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81633
  • Last Modified: 2021-05-18
  • Relevance: 799.09
  • The CFSA waterlot is approximately 35,000 m2 (3.5 ha) in size and contains six docks and two floating barges. Contaminants of concern (COCs) encountered in the CFSA waterlot during the most recent investigation confirmed the presence of metals, PAHs, and PCBs at concentrations exceeding the maximum numeric remedial action objectives (NRAOs).  PSPC is proposing to remove the existing marina structures and remediate the contaminated sediment within the CFSA waterlot.  The Project is ...

Project Membertou Realty Expansion - Equipment Retail Facility

  • Location (Membertou First Nation, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81632
  • Last Modified: 2021-05-18
  • Relevance: 798.98
  • Construction of a 10,00sq2 building to house an equipment and repair facility. Total project footprint is approximately 2 acres and includes the building and site development. All new permanent infrastructure to be constructed as part of the project, including water, sewer, stormwater, overhead and underground power distribution as well as communications.

Project Viterra Pacific Terminals New Revetment Slope

  • Location (Viterra Pacific Terminals New Revetment Slope, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81631
  • Last Modified: 2021-05-18
  • Relevance: 798.17
  • The project involves removing a portion of a failing retaining wall and replacing it with a new revetment slope consisting of rock fill, geotextile and rip rap. Work is anticipated to be completed using land-based excavators, dump trucks, and demolition equipment. Equipment will excavate the area behind the existing wall, remove deteriorated sections of the concrete retaining wall and base slab, and place fill material and rip rap to reinforce the excavated slope. Works below the high-water ...

Project Cote First Nation Wood Treatment Remediation Project

  • Location (Cote IR 64, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81544
  • Last Modified: 2021-05-18
  • Relevance: 796.14
  • Cote First Nation operated a historical fencepost treatment facility through the 1980s that has resulted in some metals impacts primarily in the soils at a property located within the Badgerville town boundaries (09-35-30-32-W1).  Various surface soil samples were collected as well and test holes were drilled for the purpose of soil sample collection.  Groundwater monitoring wells were installed and groundwater samples have been collected and analyzed.  The soil samples confirmed ...

Project Visitor Centre Recapitalization in Gros Morne National Park

  • Location (Gros Morne National Park, Newfoundland and Labrador)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81630
  • Last Modified: 2021-05-17
  • Relevance: 794.6
  • Gros Morne National Park's Visitor Reception Centre, located in the central region of the park, is in need of renovations and upgrades. The existing structure will be significantly demolished and rebuilt for a total building area of 1125 m2. The upgrades will require reconstruction of, and modifications to, the foundations and roof framing to suit the upgraded and enlarged footprint. The parking lot expansion will require some tree clearing, for an approximate cleared area of 5560 m2., ...

Project Eradicating invasive fallow deer from Sidney Island to facilitate forest restoration

  • Location (Detailed Impact Assessment, Gulf Islands National Park Reserve, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81629
  • Last Modified: 2021-05-17
  • Relevance: 794.57
  • Parks Canada is funding a collaborative project for the purpose of facilitating long-term recovery of the forest ecosystem on Sidney Island. Currently, the ecosystem is in a severely-degraded state as a result of decades of over-browsing by invasive fallow deer. A series of restoration and conservation activities, including the eradication of invasive fallow deer from Sidney Island, have been recommended. Parks Canada and other project partners and reviewing these recommendations for potential ...

Project Expansion of The Concrete Pump Truck Manufacturing Plant in Texas, USA

  • Location (11917 FM 917, Alvarado, Texas, USA, Outside Canada)
  • Assessment Type: Project outside of Canada
  • Status: In progress
  • Reference Number: 81622
  • Last Modified: 2021-05-17
  • Relevance: 793.72
  • Delehay Group of Companies is requesting financing from the Business Development Bank of Canada (BDC) to expand the manufacturing facility and add a new paint booth. The funds will be used to erect a 4,275 square meters steel building expansion and add a new paint booth that will be integrated into the building.   The site of 40,470 square meters is owned by DLDUS Inc., part of Delehay Group of Companies, and located at 11917, FM 917, Alvarado, Texas, USA.   The building ...

Project Alderville First Nation - Communal and POE Water Treatment Systems

  • Location (Alderville First Nation Reserve, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81541
  • Last Modified: 2021-05-17
  • Relevance: 791.77
  • The Alderville First Nation (the Proponent) is proposing to decommission, construct and upgrade water-related infrastructure, entirely within the Alderville First Nation. New construction includes: A production well; A high capacity water treatment plant; ~750 metres of conveyance piping; 18 service connections to public buildings; 10 point-of-entry systems; An underground reservoir for water storage; and A high lift pumping station. Upgrades include: Works on ...

Project Cascade Pit Gravel Crushing

  • Location (Banff National Park, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81542
  • Last Modified: 2021-05-16
  • Relevance: 787.44
  • Parks Canada Highway Operations Unit is proposing to crush 11,033m3 of existing gravel debris that is currently stored as Cascade Pit in Banff National Park for use in winter road abrasive. Once crushed, 5000m3 of the material will be moved immediately from the pit to the Banff Operations Compound, and pickled for use as winter abrasive. The remaining 6033m3 will remain at Cascade Pit until 2022, when it will be transported for storage at the Operations Compound, where it will be pickled for ...

Project Hydrometric Station Decommissioning - Fisher River, Manitoba

  • Location (Fisher River, Manitoba, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81507
  • Last Modified: 2021-05-16
  • Relevance: 787.44
  • Environment and Climate Change Canada proposes to decommission a non-operational hydrometric station at Fisher River, Manitoba. This includes removing a metal walk-in shelter and a cableway. The cableway consists of a 55 m steel cable across the river, 2 towers (10 m from the river), and concrete anchors for the towers (7 m from the river). The steel cable will be cut and immediately winched to a drum. The towers and anchors will then be removed. The work will be completed within 1-3 days.

Project Banff Air Strip Structure Removal

  • Location (Banff National Park, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81532
  • Last Modified: 2021-05-15
  • Relevance: 783.16
  • Parks Canada is proposing to remove all non-emergency assets/structures at the Banff Airstrip, including two aircraft hangers and two aboveground storage tanks. This work will improve the safety for people and wildlife alike by reducing the current environmental footprint while removing hazards from abandoned structures. The airstrip itself will remain in place as an emergency landing site.

Project Stanley Park Water Supply Tunnel - Chilco Shaft

  • Location (Stanley Park Water Supply Tunnel - Chilco Shaft, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81531
  • Last Modified: 2021-05-15
  • Relevance: 783.16
  • The Greater Vancouver Water District   is planning to construct a major water infrastructure project, referred to as the Stanley Park Water Supply Tunnel, to replace a section of existing water supply infrastructure. When complete, the new tunnel will meet current seismic standards, help ensure the continued reliable delivery of clean, safe drinking water to the region, and increase the capacity of the existing system to support the region's growing population. The Project ...

Project Cavendish Campground New Loop Construction

  • Location (Prince Edward Island National Park, Prince Edward Island)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81529
  • Last Modified: 2021-05-15
  • Relevance: 783.16
  • Climate change and its impacts on coastal shorelines (accelerated erosion, damaging wind events) have encouraged park managers to plan for coastal retreat for visitor offers such as camping. As such, this proposed project will relocate a new campground loop for Cavendish Campground inland to be more protected from climate change impacts. It was also chosen due to its room for expansion in future years as erosion continues to erode the shoreline away at Cavendish Campground. The new loop will ...

Project Phase I Vista Test Underground Mine and Vista Mine Phase II Expansion Projects

  • Location (10 kilometres east of Hinton, Alberta)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 80731
  • Last Modified: 2021-05-14
  • Relevance: 781.27
  • Coalspur Mines (Operations) Ltd. is proposing to expand the existing Vista Coal Mine Phase I (Phase I), a surface coal mine located approximately 10 kilometres east of Hinton, Alberta. The operation would extract and export thermal coal to international markets. The proposal includes two expansions: an underground coal mine (Vista Test Underground Mine) and a westward expansion of the Phase I mine pits (Vista Mine Phase II Expansion). The expansions would use existing Phase I mine ...

Project Repair work on the petroleum park (PHL)

  • Location (3 Wing Canadian Forces Base Bagotville, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81627
  • Last Modified: 2021-05-14
  • Relevance: 780.66
  • This project consists of work execution, labor, materials and tools necessary to repair the Canadian Forces Base Bagotville (CFB) petroleum park (PHL). The work involves, but is not limited to, the main tanks (200-2 and 200-3) distribution piping replacement including supports and walkways as well as a used fuel tank outside building B277. Two distribution pumps will be replaced and two reception pumps will be removed. Two concrete slabs will be built at the refueling areas for the new ...

Project Tlowitsis Nation-Nenagwas Village Development

  • Location (The project takes place in the City of Campbell River in British Columbia, Canada, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81625
  • Last Modified: 2021-05-13
  • Relevance: 777.4
  • Tlowitsis Nation purchased 635 acres of land on the southern boundary of the City of Campbell River to build a Community for their people who have not had a village in 55 years.  The project will take place on reserve land.  The village infrastructure will include water supply, a wastewater system with an ocean outfall, roadways throughout the village and main roads to access the village as well other infrastructures such as schools, daycare, community center and a health ...

Project Stoney Phase 18 Housing Project

  • Location (Bearspaw First Nation, Alberta) (Chiniki First Nation) (Wesley First Nation)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81471
  • Last Modified: 2021-05-12
  • Relevance: 772.65
  • Stoney Nakoda First Nation plans to construct nine housing units. Three units will be at Bearspaw First Nation, three units at Chiniki First Nation, and three units at Wesley First Nation. Each housing unit will be between 1200 and 1500 square feet in size.

Project Breaching Range Development in Areas 7 and 8, Range and Training Area, Garrison Petawawa

  • Location (Range and Training Area, Garrison Petawawa (Area 7), Ontario) (Range and Training Area, Garrison Petawawa (Area 8))
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81621
  • Last Modified: 2021-05-12
  • Relevance: 772.54
  • The two training sites proposed for development will facilitate Canadian Armed Forces Explosive Forced Entry (EFE) breaching techniques. Each site will consist of a 100m x 25m elevated gravel pad and 3 foot by 8 foot high concrete walls which will divide the 100m pad at 25m increments. Each site will be surrounded by a 6 foot high chain link fence.

Project GTA West Project

  • Location (Highway 400, Ontario) (Highway 401/407)
  • Assessment Type: Designated project - Awaiting initial project description
  • Status: In progress
  • Reference Number: 81381
  • Last Modified: 2021-05-12
  • Relevance: 772.48
  • The Ontario Ministry of Transportation is proposing to construct and maintain a new highway located in the northwest Greater Toronto Area. As proposed, the GTA West Project would be 59 kilometres in length and pass through the municipalities of Vaughan, Caledon, Brampton, and Halton Hills. It would connect highway 400 (between Kirby Road and King-Vaughan Road), to the highway 401/407 interchange area, located near the northern end of highway 403.   The project has been referred to ...

Project Maintenance Dredging at FRPD Waterlot - Amendment PER No. 20-047-01 - Extension to the Expiry Date

  • Location (Maintenance Dredging at FRPD Waterlot, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80601
  • Last Modified: 2021-05-12
  • Relevance: 770.62
  • Fraser River Pile & Dredge (GP) Inc. (FRPD) proposes to conduct multi-year and periodic maintenance dredging within the waterlot fronting the New Westminster works yard, generally located at 447 Twentieth Street, New Westminster, British Columbia up until November 26, 2025. This would require an extension to the approved project permit (PER No. 20-047), which has an expiry date of May 31, 2021. The extension is to reflect the validity of substrate samples taken at this dredging site for ...

Project Highway 165 Grade Raise near Beauval, SK

  • Location (Beauval, SK, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81517
  • Last Modified: 2021-05-12
  • Relevance: 770.62
  • The Saskatchewan Ministry of Highways (Ministry) desires to complete road work to mitigate future flooding on a roadway near Beauval, Sk. This work consists of a grade raise and associated widening (i.e. notching and extending the side slopes) on the main road with additional surfacing with a base, and asphalt concrete. The majority of the widening will be contained within the existing right-of-way (ROW), however, a small expansion to the existing ROW is required to fit a new embankment. The ...

Project Pilot project for a trail accessible to visitors with dogs on leash, Multi-Use Trail No. 3. La Mauricie National Park.

  • Location (La Mauricie National Park, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81516
  • Last Modified: 2021-05-12
  • Relevance: 770.62
  • The objective of the proposed pilot project is to measure the real operational implications and impacts of the introduction of trails where dogs would be allowed on the quality of the visitor experience and on the ecological integrity of La Mauricie National Park, with a view to including in the service offer trails that are accessible to dogs on leash on a permanent basis. It will run for a period of 5 years, from June 21, 2021 to October 31, 2026. Multi-use trail #3 was selected for the pilot ...

Project Installation of Eight Steel Pipe Piles - Project Permit No. 18-184 - Extension to the Expiry Date

  • Location (Burnaby, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80533
  • Last Modified: 2021-05-12
  • Relevance: 770.62
  • The permit holder, Island Tug and Barge Limited, proposes to carry out physical activities related to the installation of eight steel pipe piles up until December 31, 2021. The installation of the piles has been delayed for various reasons and work cannot proceed until after the fisheries sensitive period, therefore, an extension to the permit is required to complete the work in late 2021. This would require an extension to the approved project permit No. 18-184, which currently has an expiry ...

Project Schnitzer Fire Suppression Project - Design Amendment

  • Location (Schnitzer Fire Suppression Project - Design Amendment, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80603
  • Last Modified: 2021-05-12
  • Relevance: 770.62
  • Schnitzer Steel Canada Ltd., proposes to carry out physical activities related to the instalment of a fire suppression system, including four piers for the foundation of two fire monitor towers, until December 31, 2021. This would require an extension to the approved project permit (PER 18-196-01), which has an expiry date of April 30, 2021. Due to materials shipment delays, the project would not be completed prior to April 30, 2021. There are no changes to construction activity or the ...

Project Telus Communications Inc. - New Telecommunications Tower on Esowista No. 3 Reserve, Tofino, BC

  • Location (Telus Communications Inc. - New Telecommunications Tower on Esowista No. 3 Reserve, Tofino, BC, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81602
  • Last Modified: 2021-05-11
  • Relevance: 769.47
  • Telus Communications Inc. is proposing to construct a new 38.0 meter tall self-support, monopole tower on Esowista Reserve No. 3. The purpose of the proposed tower is to expand Telus' wireless coverage and to provide access to dependable wireless high-speed internet services in the Tla-o-qui-aht community. Cellular antennas will be mounted at the top of the tower. Access to the proposed tower site is via Nuu-Put-Tah-Chilth Road and via a driveway that will extend into Telus' existing ...

Project Drinking Water Treatment Plant Upgrades

  • Location (Listuguj, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81617
  • Last Modified: 2021-05-11
  • Relevance: 769.38
  • The proposed project consists of constructing a new 2000 m² aboveground concrete reservoir, constructing a new Water Treatment Plant (WTP) building, demolishing the existing WTP building, and upgrading the drinking water piping and existing well building. The new reservoir will be designed to allow proper contact time for chlorination and to allow enough storage capacity for emergencies and fire protection.

Project Paving of Loggiecroft Wharf, Loggiecroft Harbour Authority

  • Location (Kouchibouguac National Park, New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81620
  • Last Modified: 2021-05-11
  • Relevance: 769.32
  • The commericially operating Loggiecroft Wharf is located at the mouth of the Kouchibouguac River in the centre of Kouchibouguac National Park. The Loggiecroft Harbour Authority is proposing to pave the wharf, which currently has a gravel base. This will involve bringing in new material in order to grade the area and material for paving the surface.

Project Improvements to Beach Access - Ingonish Beach Day Use Area

  • Location (Cape Breton Highlands National Park, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81618
  • Last Modified: 2021-05-11
  • Relevance: 769.29
  • Ingonish Beach Day Use Area has a long sandy beach that attracts many visitors annually, especially during the hot summer months. In recent years, sand has not been returning in the same amounts as it did historically. Of that which does return, arrival is usually delayed, sometimes well into the summer season. And, depending on the year, is more or less restricted at or near the intertidal zone. This situation has created a variety of challenges for those using the beach. Safe access for ...

Project Construction of a New Building

  • Location (10, rue de l'Arsenal, Lévis, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81616
  • Last Modified: 2021-05-11
  • Relevance: 768.88
  • The project is to build a new building with an area of 1,200 m2 to house the 6th Field Artillery Regiment. The building will be located in Lévis on already serviced land adjacent to the armory on rue de Arsenal. The soils of the target site are contaminated with heavy metals, PAHs and VOCs. The work will include management of the soil required for the construction of the new building only.

Project Replacement of Drinking Water Pipes in the Block subdivision in the Village at Garden River First Nation

  • Location (Garden River, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81615
  • Last Modified: 2021-05-11
  • Relevance: 768.59
  • The proposed project has the primary objective to improve reliability of the water delivery system to the final subdivision in the community that needs to be upgraded, while reducing annual maintenance cost and providing improved safety. This will include: Reducing the number of water line breakages in the community Reducing the number of people/homes impacted in the event of a future incident Increasing safety to the community with fire hydrants The scope of project works ...

Project Point Pelee Marsh Restoration Project

  • Location (Detailed Impact Assessment, Point Pelee National Park, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80420
  • Last Modified: 2021-05-11
  • Relevance: 768.45
  • Since 1959, the overall percentage of open water area in the Pelee Marsh has decreased by 10% due to the expansion of cattails and Phragmites, degrading the habitat quality in the marsh. The park is proposing to use mechanical means to increase the open water in the marsh and decrease the aerial extent of invasive species. Heavy equipment will be used to cut channels and ponds in strategic areas win the marsh. Hand tools and small scale herbicide will be used to remove invasive plants. The ...

Project Construction of the Former Welland Canal Crossing

  • Location (Dain City, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81309
  • Last Modified: 2021-05-11
  • Relevance: 768.11
  • The City of Welland proposes to re-establish a Bridge crossing of the Old Welland Canal along the Forks Road alignment within the City of Welland, Regional Municipality of Niagara. A single-lane bridge once existed at this location and was removed in the spring of 2019 as it was determined to be unsafe to use. The former concrete piers remain in place and through a recent assessment, it was determined that they will require remediation work in order to support a new bridge and sustain a service ...

Project Daylu Dena Council New Water Treatment Plant

  • Location (Lower Post, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81613
  • Last Modified: 2021-05-10
  • Relevance: 765.46
  • Daylu Dena Council New Water Treatment Plant Crown-Indigenous Relations and Northern Affair Canada (CIRNAC) must determine whether the proposed Daylu Dena Council Water Treatment Plant, located in Lower Post British Columbia is likely to cause significant adverse environmental effects. To help inform this determination, CIRNAC is inviting comments from the public respecting that determination.  All comment received will be considered public.  For more information, individuals ...

Project Glooscap First Nation Entertainment Centre

  • Location (Hantsport, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81612
  • Last Modified: 2021-05-10
  • Relevance: 764.86
  • The proposed project consists of a parking lot, building and associated infrastructure with a total project footprint of approximately 1,600 m2. The building will  house a pub, sports bar and Video Lottery Terminal (VLT) rooms at Glooscap Landing. Construction activities include laterals and connections to existing portable water lines, sanitary sewer, power and communications. The project is occurring on developed land being proposed as an Addition to Reserve. 

Project Bearskin Lake - Flood Emergency, Road Repair Assessment and Design - Moose River and Riverside Creek - Public Comments Invited

  • Location (Bearskin Lake First Nation, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81271
  • Last Modified: 2021-05-10
  • Relevance: 764.18
  • In November 2019, Bearskin Lake First Nation (BLFN) experienced a rare flood emergency in the community. Ice jamming at White Sands Rapids to the east of the community caused Michikan Lake levels to rise significantly resulting in damage to roads within the community. The damage restricted movements within the community and resulted in a state of emergency requiring evacuations that lasted approximately three weeks. The structural integrity of the roads and crossings were significantly ...

Project Suncor Base Mine Extension Project

  • Location (3 kilometres north of Fort McMurray, Alberta)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 80521
  • Last Modified: 2021-05-10
  • Relevance: 764.06
  • Suncor Energy Inc. is proposing to develop the Base Mine Extension Project to sustain the supply of bitumen to the existing upgraders at Suncor's Oil Sands Base Plant operation (Base Plant). The project includes an open-pit mining operation and associated infrastructure to supply bitumen to new froth production facilities and various other production facilities at the existing Base Plant. The project is located adjacent to existing Base Plant operations approximately three kilometres north ...

Project Re-Establishing Our Healing Journeys

  • Location (Mississaugas of the Credit First Nation Reserve, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81509
  • Last Modified: 2021-05-10
  • Relevance: 762.51
  • Project Description: The project purpose is to rebuild the administration area that was heavily destroyed by fire and to renovate the residential area damaged by smoke. This portion of the building has been gutted to the studs. This land is currently developed, cleared, with access to local services - water, sewer, natural gas, hydro and telephone. The design will include a new layout and restoration of the existing building which was damaged by the fire. The proposed expansion area is ...

Project Beausoleil First Nation - Stormwater System Upgrade and Existing Drainage Rehabilitation

  • Location (Beausoleil First Nation Reserve, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81503
  • Last Modified: 2021-05-10
  • Relevance: 762.51
  • The project will improve stormwater management along Kate Kegwin Street, Wau Goosh Street, O'Gemma Street, Shingwauk Street, and Bayshore Drive in the Beausoleil First Nation in Ontario. The work will involve installing 2,350 metres of storm sewer piping and catch basins; re-ditching approximately 6,450 metres of roadside ditches; replacing approximately 450 metres of driveway culverts and approximately 120 metres of large diameter road crossing culverts; and undertaking a stormwater ...

Project Tiger Salamander Crossing

  • Location (Riding Mountain National Park, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81512
  • Last Modified: 2021-05-09
  • Relevance: 758.53
  • To improve connectivity, this project will construct a "salamander crosswalk" for Western Tiger Salamanders across highway 10 near the south entrance to the park. This will involve sloping the curbs along the boulevard and west side of the road and placing signage that encourages drivers to slow down and watch for this important species at risk.

Project Smallmouth Bass Project

  • Location (Riding Mountain National Park, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81513
  • Last Modified: 2021-05-09
  • Relevance: 758.53
  • Smallmouth bass were detected in Clear Lake by visitors in August, 2020. Smallmouth bass are not native to Clear Lake and may outcompete native species for food and habitat resources. Limiting the establishment of Smallmouth bass is a priority, aimed at minimizing potential impacts to native species and natural ecosystem processes of Clear Lake.

Project Installation of a Concrete Tank and Septic Pump-Out System at the Port of Caraquet, NB

  • Location (Caraquet DFO-SCH, New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81493
  • Last Modified: 2021-05-08
  • Relevance: 754.6
  • The project involves the construction/installation of a septic pump-out system, including a 2,000L concrete holding tank near wharf no. 804 at the Fisheries and Oceans Canada - Small Craft Harbour in Caraquet, New Brunswick.  The system includes the installation of piping and electrical infrastructure, pump and concrete tank.  The tank will contain alarms when it reaches 80% capacity, and will be pumped out by a license septic hauler and disposed off-site at an approved facility.

Project Bigstone B.O.S.S Modular Construction and Fabrication Yard Expansion Project

  • Location (Bigstone Cree Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81611
  • Last Modified: 2021-05-07
  • Relevance: 753.46
  • Bigstone Cree Nation plans to expand the Bigstone oilfield services & Supplies' (B.O.S.S) yard to allow for increased production of welded Piping spools and provide B.O.S.S  with the space needed to begin the construction of modular piping installation racks. Infrastructure development will include earth works, water, sanitary servicing and electrical, gas, and telecommunications services.

Project Moose Cree Sewage System Rehabilitation

  • Location (Moose Cree First Nation, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81610
  • Last Modified: 2021-05-07
  • Relevance: 753.41
  • Construct a lined sludge dewatering area to the west of the existing lagoon cells, remove sludge from the 3 existing sewage lagoon cells and place sludge in the dewatering area, upgrade the existing sewage lagoon by installing a new aeration system in all 3 cells, construction of Submerged Attached Growth Reactor (SAGR) cells to the east for additional sewage treatment, investigation of the inflow and infiltration in the gravity sewer collection system.

Project Lourdes-de-Blanc-Sablon Airport - Demolition and reconstruction of a hangar

  • Location (Lourdes-de-Blanc-Sablon Airport, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81609
  • Last Modified: 2021-05-07
  • Relevance: 753.29
  • The project consists of deconstructing the current hangar located on site and constructing a new building to replace it with a larger surface area. The work will include the dismantling of the structure, the preparation of the site, the excavation for a foundation wall and the installation of a septic tank. The works are scheduled for June 2021 to the end of September 2021.

Project Full Depth Parking Lot Reconstruction / Repaving at Building P-148

  • Location (Canadian Forces Base Borden, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81608
  • Last Modified: 2021-05-07
  • Relevance: 752.2
  • The Department of National Defence (DND) Real Property Operations proposes to complete full depth reconstruction of the driveway / parking area at the front of building P-148, construct/pave a new parking lot on the East side of P-148, and resurface the play area around P-148 at CFB Borden. The estimated gross area of the paving project is ~2000m2. The project will take place approximately 2.8 km southwest of Angus, Ontario. Construction is anticipated to begin in summer of 2021.

Project Rip rap placement and parking area reinforcement

  • Location (Rip rap placement and parking area reinforcement, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81505
  • Last Modified: 2021-05-07
  • Relevance: 750.72
  • Gracia Financial Corporation is proposing to raise the existing parking area from approximately 2.0 metres to 3.5 metres chart datum (CD) to prevent flooding of the site from high water flood events, and use this area for the development of a gravel parking area with a total footprint of 1,503 square metres.   The existing shoreline armament, consisting of a band of riprap located in the intertidal zone along the north ...

Project Dredge pipe removals

  • Location (Dredge pipe removals, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81606
  • Last Modified: 2021-05-06
  • Relevance: 748.98
  • Fraser River Pile and Dredge on behalf of Mainland Sand and Gravel are proposing to remove two, 660 millimeter diameter steel pipes that were used as part of the sand supply operations at the former Mainland Sand and Gravel Port Kells Sand Depot. The total length of the pipes are approximately 100 meters each. The upland sections of the pipes were removed as part of the site exit requirements in March 2021, with approximately 30 – 40 meters of each pipe remaining within port jurisdiction. ...