Project Indoor Riding Arena

  • Location (Ottawa, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81107
  • Last Modified: 2020-11-29
  • Relevance: 412.63
  • Project summary: Build an indoor riding arena to allow for year-round horse riding. How is NCC or NCC land involved:  NCC tenant to build and pay for the building. NCC's role: Arena to be constructed on NCC land by a tenant. Impacts to land or neighbours: The proposed project will not significantly change the appearance of the surrounding area, as the site is shielded by trees and cannot be seen clearly from the road. The design of the arena is consistent with the look and ...

Project Piapot Lagoon, Forcemain and Sewage Pumping Station

  • Location (Piapot IR 75, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81108
  • Last Modified: 2020-11-28
  • Relevance: 408.24
  • The current lagoon at Piapot First Nation has come to the end of its life span. The proposed project is for the: construction of a two celled HDPE lined facultative lagoon (primary cell 2.2ha, Storage: 91,000 Cu.m), construction of a new sewage pumping station (70Sq.M with a storage capacity of 50,000L), upgrades to the mechanical and electrical of an existing lift station. Installation of a new HDPE sewage force main to the new lagoon location. infrastructure life span anticipated for 30+ ...

Project Port Hardy CCG SAR - Float Replacement Project

  • Location (Port Hardy, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81173
  • Last Modified: 2020-11-27
  • Relevance: 407.06
  • The construction and installation of a new 4.3 m x 31.6 m concrete float in the Port Hardy Harbour.  The work will include: the removal of existing timber pilings and mooring float; modify and relocate the existing timber float and community timber float, including the installation of new steel piles; the relocation of existing gangway, and installation of new concrete float (which will be constructed off-site).

Project Theresa Point First Nation road re-construction

  • Location (St Theresa Pt First Nation, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81183
  • Last Modified: 2020-11-27
  • Relevance: 406.68
  • Multi-phase project to re-construct 40 kms of community roads.  First Phase is to reconstruct 10 km of main (primary) road from north cemetery to the landfill site south.  The construction will involve re-grading the road resurface the side ditch walls repair drainages.  Then apply a road stabilization solution to the entire road, a new layer of traffic gravel will be top-off, stabilization will include a long-term solution to our dust issues by applying an environmentally ...

Project Rocky Point Park Boat Ramp Repair in Port Moody

  • Location (Rocky Point Boat Ramp Repair in Port Moody, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81182
  • Last Modified: 2020-11-27
  • Relevance: 406.61
  • The Proposed Project  The City of Port Moody proposes to install new scour protection and repair the concrete boat launch ramp located at Rocky Point Park in Port Moody. The proposed scour protection includes the installation of custom gabion structures at the toe of the ramp. Gabions are proposed to be installed by excavator and extend two meters beyond the edge of the existing ramp. The concrete ramp repairs include pressure washing and concrete repair. The works are proposed to take ...

Project South Shore Corridor Project - Extended Work Hours Request

  • Location (South Shore Corridor Project - Extension to Expiry Date, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80856
  • Last Modified: 2020-11-27
  • Relevance: 406.59
  • The Proposed Project Vancouver Fraser Port Authority Infrastructure Delivery is proposing to carry out physical activities related to the approved Project Permit No. 2011-125-5: South Shore Corridor Project 24 hours a day, 7 days a week from January 4 and to July 4, 2021.   This amendment is being requested to enable construction during low traffic volumes to minimize traffic disruptions on Commissioner Street. The project components ...

Project Value Chain Solutions - Heartland Complex Expansion Project

  • Location (18 kilometres north east of Fort Saskatchewan, Alberta)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 81148
  • Last Modified: 2020-11-27
  • Relevance: 406.42
  • Value Chain Solutions Inc. is proposing to expand its approved Heartland Project, a bitumen upgrader and refinery, located in Alberta's Industrial Heartland, about 18 kilometres northeast of Fort Saskatchewan. As proposed, the Value Chain Solutions – Heartland Complex Expansion Project would increase the facility's input capacity by three hundred percent, bringing its total capacity to 119,240 m3/day or 750,000 barrels/day. The project would include activities such as the ...

Project Expansion of the Lumber Transload Facility of Goodrich Terminal2012 Ltd. at the Port of Vancouver

  • Location (Port of Vancoouver, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81179
  • Last Modified: 2020-11-27
  • Relevance: 406.33
  • Goodrich Terminal2012 Ltd. is requesting financing from the Business Development Bank of Canada (BDC) for leasehold improvements to expand their transload facility. The funds will be used to lay a rail spur and make the necessary site improvements (fencing, paving, security) to allow Goodrich Terminal2012 Ltd. to integrate rail transportation into its operations.   The site is leased from the Vancouver Fraser Port Authority and is approximately 50,000 m2 (540,000 ft2) in size. ...

Project Pacific Terminals Emergency Vehicle Road Access

  • Location (Pacific Terminals Emergency Vehicle Road Access, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81181
  • Last Modified: 2020-11-27
  • Relevance: 405.89
  • The Proposed Project Viterra Pacific Elevators Limited are proposing to construct a new access road for the use of emergency and maintenance vehicles, located at 1803 Stewart Street, Vancouver, BC. The works include demolition of approximately 82 square metres of existing buildings, demolition of two existing retaining walls and grading and paving of the new access road footprint which will be approximately 144 square metres. The existing chain linked fence will be modified and the entrance ...

Project Sandy Bay First Nation New Water Treatment Plant

  • Location (Sandy Bay First Nation, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81180
  • Last Modified: 2020-11-27
  • Relevance: 405.87
  • Sandy Bay First Nation New Water Treatment Plant Project Summary: Sandy Bay Ojibway First Nation (SBOFN) Reserve No. 283 is located on the south basin of Lake Manitoba in the Westlake Region of Manitoba, 120 km northwest of Winnipeg and 60 km northwest of Portage la Prairie. The reserve is accessed by an all-weather provincial road grid system via PTH 50. SBOFN has a total registered population of 6,781 people. The estimated on reserve population including both registered and ...

Project Annacis Water Supply Tunnel Safe Havens Amendment

  • Location (Annacis Water Supply Tunnel Safe Havens Amendment, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80962
  • Last Modified: 2020-11-27
  • Relevance: 405.82
  •   The Proposed Project Metro Vancouver proposes to amend the scope of their existing project permit No. 17-029: Annacis Water Supply Tunnel Safe Havens. The project is located under the Fraser River, between the City of New Westminster and the City of Surrey. The additional scope includes installation of instrumentation to monitor ground movement and protect   infrastructure as part of the physical activities related to the construction of the Annacis Water Supply ...

Project Chemtrade maintenance dredging

  • Location (Chemtrade maintenance dredging, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 81022
  • Last Modified: 2020-11-27
  • Relevance: 405.78
  • Chemtrade proposes to conduct maintenance dredging adjacent to its Berth 1 near 100 Amherst Avenue in North Vancouver, BC. The purpose of the project is to dredge and remove accumulated sediment to achieve appropriate vessel clearance at the berth. The scope of works includes dredging a footprint of approximatively 240 square meters to a target dredge depth of -11.0 metres chart datum. The total dredge volume will be 516 cubic metres. Dredging will be completed with a clamshell bucket and will ...

Project Canadian Nuclear Laboratories Bulk Storage Laydown Area

  • Location (Chalk River Nuclear Laboratories Ltd., Chalk River, Ontario, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81178
  • Last Modified: 2020-11-27
  • Relevance: 405.45
  • In support of ongoing operations at Canadian Nuclear Laboratories (CNL), the construction of a laydown area is proposed at the Atomic Energy of Canada (AECL), Chalk River Laboratories (CRL) site.  The new laydown area will provide a centralized location to store supplies that support waste management operations at the CRL site.   The proposed site for the facility is located on approximately 1,200 m2 of previously disturbed land.  The physical activities associated with this ...

Project Parks Canada HWY 93S Boom Creek Culvert Replacement

  • Location (Banff National Park, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80845
  • Last Modified: 2020-11-27
  • Relevance: 405.4
  • Replace existing corrugated steel plate arch culvert at Boom Creek on Hwy 93S with a new concrete box culvert. Existing culvert will be decommissioned and abandoned in place. New culvert to be installed beside old and stream realigned to match new culvert entrance. Fish connectivity to be improved using baffles, a j-hook at entrance, and outfall pool. Temporary bypass lanes required. Paving, rip rap, and stream bank restoration included.

Project Canadian Nuclear Laboratories Intermediate Level Waste Storage Area

  • Location (Chalk River Nuclear Laboratories Ltd., Chalk River, Ontario, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81177
  • Last Modified: 2020-11-27
  • Relevance: 405.36
  • In support of ongoing operations at the Canadian Nuclear Laboratories (CNL), the construction of an Intermediate Level Waste (ILW) Storage Facility is proposed at the Atomic Energy of Canada (AECL), Chalk River Laboratories (CRL) site.  The new facility will create a centralized storage location for CNL's ILW until a final solution is developed.  The proposed site for the facility is located on approximately 2,100 m2 of previously disturbed land.  The physical activities ...

Project Sucker Creek Housing Project 2020 (4 Units)

  • Location (Sucker Creek First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81100
  • Last Modified: 2020-11-26
  • Relevance: 402.19
  • Rural residential Housing. Supply and install 1400 sq ft prefabricated modular home with Poured concrete foundation piling system. Site servicing comprised of 1500 gal precast concrete water cistern, 2000 gal precast concrete sewage holding tank, 3 phase power, natural gas and driveway. Rubber tired backhoe, Skidsteer, John Deere 200 Trackhoe, and D5 Cat Crawler Tractor to be used for excavation, driveway construction, backfill and landscaping. Rural residential Housing. Supply and install ...

Project Red Sucker Lake First Nation New Landfill

  • Location (Red Sucker Lake, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81176
  • Last Modified: 2020-11-26
  • Relevance: 402.08
  •   Red Sucker Lake First Nation (RSLFN) is located approximately 710 km northeast of Winnipeg, Manitoba. The community is accessible all year round by air travel and by winter road during the winter months. The total registered population of RSLFN is approximately 1,128 members, based on the regional population statistics (January 2020).   The proposed Waste Management Facility (WMF) is located north of RSLFN on reserve Land, approximately 500 m north of the ...

Project Routine Maintenance Dredging

  • Location (Port of Belledune, New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80963
  • Last Modified: 2020-11-26
  • Relevance: 401.88
  • The proposed project involves the dredging of the entrance and interior of the Port of Belledune, located at Belledune, NB.  The dredged material will be disposed of on site in a man-made cell, previously constructed for the purpose of accepting dredged material from the Port.  The proposed dredging meets the definition of the Department of Fisheries and Oceans' Routine Maintenance Dredging Code of Practice.

Project Wasamac Gold Mine Project

  • Location (Wasamac, Quebec)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 80879
  • Last Modified: 2020-11-26
  • Relevance: 401.55
  • Monarch Gold Corporation is proposing the construction, operation, decommissioning and abandonment of an underground gold mine located in the Abitibi-Témiscamingue region, approximately 15 kilometres from downtown Rouyn-Noranda, Quebec. As proposed, the Wasamac Gold Mine Project would have a mine life of 11 years and an ore production capacity of 6053 tonnes per day. The project would include the operation of an underground mine, the construction of an ore processing plant ...

Project Nappan Island Bridge Replacement, Municipality of Trent Hills

  • Location (Municipality of Trent Hills, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81175
  • Last Modified: 2020-11-25
  • Relevance: 398.21
  • The Municipality of Trent Hills proposes to replace the Nappan Island Bridge located on Nappan Island Road, approximately 4.6km East of Highway 30. The structure spans the narrows between Burnt Point Bay and Lake Seymour. A new bridge will be built approximately 2m west of the existing bridge.  The new bridge will be a single lane steel Bailey bridge measuring approximately 60 m long and 6.55 m wide with a 1.67 m wide pedestrian lane on the east side of the bridge. As the new bridge ...

Project Great Sandhills Railway Switching Operation at North West Terminal Project - Revised Design

  • Location (1 kilometre east of Unity, Saskatchewan, Saskatchewan)
  • Assessment Type: Request for designation
  • Status: In progress
  • Reference Number: 81166
  • Last Modified: 2020-11-25
  • Relevance: 397.83
  • Great Sandhills Railway Ltd. is proposing to expand the existing North West Terminal, a grain handling facility located one kilometre east of Unity, Saskatchewan and serviced by the Canadian National Railway (CN) and the Canadian Pacific Railway (CP). As proposed, the Great Sandhills Railway Switching Operation at North West Terminal Project – Revised Design would include 8.9 hectares of new tracks, including two shop tracks and a repair shop. The new tracks would reduce ...

Project Okanese Cree Nation - Water Treatment Plant Upgrade

  • Location (Okanese IR 82, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81174
  • Last Modified: 2020-11-25
  • Relevance: 397.58
  • The existing water treatment plant for Okanese Cree Nation has reached the end of it's life span as it is not able to meet demand of the community, therefore a new water treatment plant is proposed to be constructed in NE 32-22-10 W2M. The water treatment plant upgrades to include a new water treatment plan, including room for expansion to meet the future goals of the community. The upgrade will also include new treatment and pumping equipment, dry pit access, backup power, control ...

Project Decommissioning of Buried Fuel Lines, Sable Island NPR - Environment and Climate Change Canada

  • Location (Sable Island National Park Reserve of Canada, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 81069
  • Last Modified: 2020-11-24
  • Relevance: 393.87
  • The proposed project will see the decommissioning of a series of buried fuel lines which historically supplied fuel oil to various buildings at the Sable Island Main Station and Western Light.  Since the fuel lines are no longer in active use, the continued presence of potential fuel in the lines presents an on-going risk of leakage and contamination.  The objective of the project is to recover fuel oil that may remain in the fuel lines, to remove accessible portions of the fuel lines ...

Project Building Demolitions and Associated Soil Remediation at Stony Point (former Camp Ipperwash), Ontario

  • Location (Stony Point is located at 9356 Army Camp Road within the municipality of Lambton Shores, in southwestern Ontario, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81172
  • Last Modified: 2020-11-24
  • Relevance: 393.85
  • Canada is committed to the timely and successful clearance and remediation of the Stony Point land in accordance with the Ipperwash Final Settlement Agreement between the Kettle and Stony Point First Nation and Her Majesty the Queen in Right of Canada. As per the Final Settlement Agreement, the Department of National Defence (DND) will conduct clearance and remediation activities to prevent, minimize and mitigate risks to human health, safety and the environment for the express purpose of ...

Project French River Boathouse, Wharf, and Workshop

  • Location (French River Dam Office, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81171
  • Last Modified: 2020-11-24
  • Relevance: 393.82
  • This project will involve work at three structures at the French River Dam office site in Dokis, Ontario: the boathouse, wharf, and workshop. The boathouse will be replaced with a new light wood framed boathouse. This will include a new watercraft lifting system, concrete pier off-shore foundations and on-shore foundations. The wharf will be replaced with a new cast-in-place concrete earth retaining structure. The foundation of the workshop will be replaced with cast-in-place concrete piers.

Project Winter Cove Boat Ramp Repair, Saturna Island

  • Location (Gulf Islands National Park Reserve, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81170
  • Last Modified: 2020-11-24
  • Relevance: 393.23
  • This project will repair a hazardous void in the intertidal portion of the boat ramp at Winter Cove on Saturna Island. The plan is to fill the void with approximately 3 cubic meters of washed clear crush aggregate, compacting the material so as to produce a durable surface. The choice to use washed clear crush aggregate rather than the typical road base gravel is intended to minimize the likelihood of siltation, increased turbidity, and associated negative impacts to the marine environment. All ...

Project Hardrock Gold Mine Project

  • Location (Geraldton, Ontario)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: Completed
  • Reference Number: 80068
  • Last Modified: 2020-11-24
  • Relevance: 393.14
  • Greenstone Gold Mines is proposing the construction, operation, decommissioning, and abandonment of an open-pit gold mine and on-site metal mill located approximately five kilometres south of Geraldton, Ontario, at the intersection of Highway 11 (Trans-Canada Highway) and Michael Power Boulevard. As proposed, the gold mine would have an ore production capacity of 30,000 tonnes per day, and the metal mill would have an ore input capacity of 30,000 tonnes per day. Please note that this project ...

Project Deschambault Lake Diesel Generating Station

  • Location (Kimosum Pwatinahk IR 203, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81169
  • Last Modified: 2020-11-24
  • Relevance: 393.08
  • A Phase II environmental site assessment at the former SaskPower electrical generating station in Deschambault Lake (Parcel T, Plan 66PA07010) has identified soil impacts have concentrations of petroleum hydrocarbons and metals (chromium and nickel) above Provincial criteria.  A Corrective Action Plan has been prepared for the removal (excavation) of the impacted soil for disposal at a class II Industrial Landfill.  The National Classification System for Contamineted Sites scope is ...

Project Prairie Lights Power Project

  • Location (Greenview, Alberta)
  • Assessment Type: Assessment not applicable
  • Status: Completed
  • Reference Number: 80324
  • Last Modified: 2020-11-24
  • Relevance: 392.8
  • Prairie Lights Power GP Inc. is proposing the construction, operation and decommissioning of a 360-megawatt natural gas-fired power generation facility that would deliver electricity to Alberta. The proposed Prairie Lights Power Project would be located 35 kilometres south of Grande Prairie, within the Municipal District of Greenview, Alberta.

Project Century Gold Project

  • Location (Timmins, Ontario)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: Terminated
  • Reference Number: 80155
  • Last Modified: 2020-11-24
  • Relevance: 392.8
  • Porcupine Gold Mines, a subsidiary of Goldcorp Canada Ltd., is proposing the construction, operation, decommissioning and abandonment of a new metal mill as well as the expansion of its existing Dome Mine, located in Timmins, Ontario. The area of mine operations for the existing Dome Mine would increase by over 50%. As proposed, the Century Gold Project would operate for 10 to 16 years, and include an open-pit gold mine with an ore production capacity of 70,000 tonnes per day. The ...

Project New Prosperity Gold-Copper Mine Project

  • Location (Fish Lake, British Columbia)
  • Assessment Type: Environmental assessment by Review Panel under CEAA 2012
  • Status: Completed
  • Reference Number: 63928
  • Last Modified: 2020-11-24
  • Relevance: 392.76
  • The Project consists of an open pit mine development and a 70,000 tonne per day concentrator facility with an average annual production of 108 million pounds of copper and 247 thousand ounces of gold production over a 20 year mine life. The project mine site, which includes the open pit, concentrator facility, support infrastructure, and associated tailings and waste rock areas, is approximately 125 km southwest of Williams Lake, British Columbia. The Project also includes an approximately 125 ...

Project EnCana Shallow Gas Infill Development Project in the Suffield National Wildlife Area

  • Location (Suffield, Canadian Forces Base, Alberta)
  • Assessment Type: Environmental assessment by Review Panel under CEAA 2012
  • Status: Completed
  • Reference Number: 15620
  • Last Modified: 2020-11-24
  • Relevance: 392.75
  • EnCana Corporation is proposing to drill up to 1,275 new shallow gas wells within the boundary of the Canadian Forces Base Suffield National Wildlife Area (NWA) over a three-year period, essentially doubling the existing 1,154 gas wells installed over the past 30 years. The proposal would see the development of a maximum of 16 wells per 640-acre section. Associated with these wells will be pipelines to connect the wells to existing and new infrastructure for delivery to market using low-impact ...

Project Red Mountain Underground Gold Project

  • Location (Stewart, British Columbia)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: Completed
  • Reference Number: 80093
  • Last Modified: 2020-11-24
  • Relevance: 392.74
  • IDM Mining Ltd. proposes to construct, operate and decommission an underground gold-silver mine located approximately 15 kilometres northeast of Stewart, British Columbia. As proposed, the Red Mountain Underground Gold Project would produce approximately 1000 tonnes of mineral ore per day or 365,000 tonnes per year, over an operational mine life of six years. Please note that this project was formerly known as the Red Mountain Gold Mine Project.

Project Magino Gold Project

  • Location (Wawa, Ontario)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: Completed
  • Reference Number: 80044
  • Last Modified: 2020-11-24
  • Relevance: 392.73
  • Prodigy Gold Incorporated, a wholly-owned subsidiary of Argonaut Gold Incorporated, is proposing the construction, operation, decommissioning and abandonment of an open-pit gold mine and metal mill located 14 kilometres south-east of Dubreuilville, Ontario. Mining would occur over 10 years with an ore production capacity of 45 200 tonnes per day. The on-site metal mill would have an ore input capacity of 35 000 tonnes per day and would operate for approximately 12 ...

Project Construction of a Royal Canadian Mounted Police Detachment in Estevan, Saskatchewan

  • Location (Estevan, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80530
  • Last Modified: 2020-11-24
  • Relevance: 392.58
  • The Royal Canadian Mounted Police is proposing to construct a new police detachment in the Town of Estevan, Saskatchewan. The planned footprint is 1200 metres squared. Once completed the detachment will consolidate a number of now leased spaces. Construction will occur on an existing serviced lot in the Town of Estevan Saskatchewan.

Last UpdatedDisplay Filters

Filters

Comment Tags Display Filters

Date modified: